New Construction
Custom homes and small commercial — built to drawing, on schedule.

Ground-up residential and light commercial construction, from foundations and framing through final inspections and warranty.
What's included
01Custom residential
02Light commercial & retail
03Energy-efficient envelopes
04Architect collaboration
Calgary · the 2026 picture
Build costs, locked before the dig.
Reviewed May 2026
Ground-up budgets live and die by material timing. In 2026 metals are the watch item — structural steel and metal fabrications rose on tariffs — while framing lumber has eased. Calgary's build costs have otherwise settled into low single-digit annual growth.
We lock material pricing with firm 60–90-day quotes and stage long-lead items early, so a tariff headline doesn't reopen your budget mid-frame. Permits, inspections and the warranty are ours to carry.
Steel & metals
Watch item
Softened
Framing lumber
60–90 days
Quotes held


